Not only are we working from the bottom of the roof we re also starting with the bottom most layer in terms of roofing components.
How to start a roof.
Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back.
Hammer down any large nails that are exposed by the removal.
Lay a starting row at the bottom of the roof along the edge.
Some roofers install shingles so the cutout lines describe a slight angle as you look from the bottom to the top of the roof.
Inspect the underlying roof sheathing for damage and make any needed repairs.
If your eave is one straight length then pick an end and work to the other.
For example if your roof measures 10 feet 3 0 m x 10 feet 3 0 m and the slope of the roof is 12 12 giving a slope factor of 12x12 12x12 12 converts to 1 414 in decimal form you would multiply 10 x 10 x 1 414 to get the total of 141 square feet of roofing.
See below for a shopping list tools and steps subscr.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
However most people prefer the cutout lines to be aligned so they make straight vertical lines.
This step by step tutorial shows how to install 3 tab roof shingles using the racking method.
Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2.
The asphalt roof shingles are the visible part and the first line of defense against inclement weather but what s underneath them really counts the first material installed at the eave is the drip edge.
Also place a nail 2 inches from each end of the shingle in line with the other.
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
You ll be able to roll out long sections at a time if you have a low pitched roof but the underlayment may slip off the eaves on steeper roofs so roll out no more than 10 ft.
Start by applying the drip edge to the eaves of your roof.